Not comparing like with like at all. For starters I think it cost €4.2M, and that was spent on developing a 10 acre greenfield site. That means clearing it, levelling it off, fencing it off, laying two full size grass pitches with I don't know how many tonnes of Wexford sand trucked up for drainage and top soil on top.
Then there is the 2,000 seater stand, which is of a better quality that Sligo's. That's not being petty, I've been in both, above and below, and it's the truth. It houses the two dressing rooms, male and female referee rooms, club shop, office, bar, physion room, drug testing room and another couple small offices/store rooms as well as a big TV interview area. And it doesn't leak. The whole thing is fully wired for power/light/phone/ISDN/fire sprinkler system/fire alarm/air system etc etc. There are also male, female and disabled toilets at either end the stand.
The main pitch and second pitch are both floodlit, with all the area behind the stand tarmacked and an ESB sub station down the far end. Oh yeah, and the turnstyle plaza at the front.
And that leaves out all the professional fees of architects and engineers and whatever else.
Bookmarks