This is the cruz here PS. Given the limited crowds/potential etc of UCD, you'll always be moving at a slower rate than other Premier Division clubs (bar Dublin City), and arguably slower than any other clubs in the league full-stop.Originally Posted by pineapple stu
To use the aul cliche - the league will only be as strong as its weakest team.
Our league is currently very weak on every aspect. Experience has shown that most teams will not improve their off-the-pitch set-up to any significant degree without some form of compulsion/incentive to do so. Hence why there are ongoing plans to address this - like Licensing.
This will be an ongoing process. For example, currently you need 1,500 seats for a premier stadium. The new proposal from the FAI now mandates 3,000. In a couple of years it will most probably rise to 4,000 or 5,000. It may go even higher after that.
If a team is not not keeping up with everyone else then it is clear that only one of 2 things can happen :
1) The rules punish you for this
Your percieved saviour of licensing will do this to you sooner or later through off-the-pitch criteria such as the number of seats in your stadium.
2) The rules themselves are deliberately pegged at a level that doesnt punish the likes of Dublin City and UCD - hence holding the league as a whole back.
If we have to demand a lower than desired rate of improvements to ensure that the weakest clubs don't get relegated for their infrastructure, then it is to be fully expected that the rest of the league will therefore be held-back by this decision.
This is the cruz of the situation PS. The writing appears to be on the wall - at some point or other small clubs like UCD and Dublin City will fall-foul of the ambitions of the rest of the league. This is purely because these small clubs does not have the finances or support base to have anything beyond the most basic of facilities.
Your club can pretend that this won't be the case, and cling-on desperately and try to scupper this inevitability. Or it can read what's written on the wall and get on with keeping up with everyone else. The fact that you are proposing to build a new stadium with only 1,500 seats - the current bare minimum - suggests that the will is not there to keep-up. If your stadium plans had any forsight whatsoever, a higher number of seats would've been included now for the inevitable increase in the minimum requirement that will eventually happen. If you always implement the bare minimum then you will be holding the league as a whole back. And sooner or later you will be punished for this. The same end result as you fear is being proposed in the current FAI proposal.
The writing is on the wall......
Bookmarks