Originally Posted by
Mark Breen
Plan is not for a fully enclosed all seated stadium, Plan is and always has been for two stand's, one either side of the pitch.....
Also the other stand (Not yet started) is not going to be a temporary stand, Its going to be a permanent stand and SDCC are in the process of getting prices... Its either going to be a concrete build on site as with the main stand they have now, or its going to be built out of the same materials as some stadium's in England which are built off site and assembled on site....
If they go with the second option, it is likely they could have the second stand built very close to the start of the season provided they nominate the builder this side of Christmas.... But the second option my not get the go ahead due to costs......